+86 15359293870 2804538582@qq.com
Industrial equipment parts procurement network

07PR22 GJR2294700R1 ABB input and output unit

$899.00

In stock

model: 07PR22 GJR2294700R1

Order (minimum order quantity): 1

Payment: telegraphic transfer
Product origin: Sweden
Port of shipment: Xiamen, Fujian
Delivery time: in stock
Hotline: 1816568710207DC91

07PR22 GJR2294700R1 ABB input and output unitillustrationThis section tells you how to install the drive on wall without vibration dampers. The degree of protection is IEC:

IP00 and UL: open type.

  1. See the dimensions in chapter Dimensions and weights.Mark the locations for the four mounting holes.
  2. Drill the mounting holes.
  3. Insert wall plugs into the holes and start to screw bolts into the plugs. Drive the bolts deep enough into the

wall to make them carry the weight of the drive.

  1. Position the drive onto the bolts on the wall.
  2. Tighten the bolts securely in the wall.

 

When thyristor converters operate, the line voltage is short-circuited during commutation from one

thyristor to the next. This operation causes voltage dips in the mains PCC (point of common

coupling). For the connection of a power converter system to the mains, one of the following

configurations applies:

Configuration A

When using a converter, a minimum of impedance is required to ensure proper

performance of the snubber circuit. Use a line reactor to meet this minimum

impedance requirement. The value must therefore not drop below 1 % uk (relative

impedance voltage). It should not exceed 10 % uk, due to considerable voltage drops

at the converters outputs.

Configuration B

If special requirements have to be met at the PCC (standards like EN 61 800-3, DC

and AC drives at the same line, etc), different criteria must be applied for selecting a

line reactor. These requirements are often defined as a voltage dip in percent of the

nominal supply voltage. The combined impedance of ZLine and ZL1 constitute the total

series impedance of the installation. The ratio between the line impedance and the line

reactor impedance determines the voltage dip at the PCC. In such cases, line chokes

with an impedance around 4 % are often used.

Example calculation with ukLine = 1 % and ukL1 = 4 %:

Voltage dip = ZLine / (ZLine + ZL1) = 20 %. Detailed calculations see Technical guide.

 

07PR22 GJR2294700R1 ABB input and output unitillustration1

 

The prices of all products of Zhangzhou Fengyun may fluctuate at any time. The specific price is subject to the customer service quotation. Please confirm the model, product, price and other details with the customer service before placing the order. Second-hand and brand-new products are sold in the store. Please contact the customer service for details.

 

operates automation modules, cards, CPU, PLC, DCS of European and American brands, and distributes products widely used in electronics, metallurgy, chemical, power plants, steel plants, rubber, cement, mechanical equipment, construction and other industries.

It has established close cooperative relations with many internationally renowned PLC product maintenance service providers, including North America, Europe, Asia, etc.

 

07PR22 GJR2294700R1 ABB input and output unitillustration2

 

Recommended ABB related models:

0745648E 07DC91C 07KT97 GJR5253000R4270
07AC91 07DC92 07KT97B
07AC91D 07EA90-SI 07KT97F1
07AC91F 07KR264 07KT97H3
07AI91 07KR31 07KT98
07BR61R1 GJV3074376R1 07KR51 07KT98  H4 GJR5253100R3260
07CR41 07KR51 220VDC 07KT98 GJR5253100R4278
07DC91 07KT93 07KT98C GJR5253100R028

 



    Customers reviews

    There are no reviews yet.

    Be the first to review “07PR22 GJR2294700R1 ABB input and output unit”

    Your email address will not be published. Required fields are marked *

    Search for products

    Back to Top
    Product has been added to your cart